精品三级久久久久电影我网-欧美一区二区-苍井空亚洲精品aa片在线播放-国产特级毛片aaaaaa高清-欧美色欧美亚洲高清在线视频

Language: Chinese line English

LOAD MOMENT INDICATOR

  • TRUCK MOUNTED CRANE LOAD MOMENT INDICATOR
  • TRUCK MOUNTED CRANE LOAD MOMENT INDICATOR
  • TRUCK MOUNTED CRANE LOAD MOMENT INDICATOR
  • TRUCK MOUNTED CRANE LOAD MOMENT INDICATOR
  • TRUCK MOUNTED CRANE LOAD MOMENT INDICATOR
TRUCK MOUNTED CRANE LOAD MOMENT INDICATORTRUCK MOUNTED CRANE LOAD MOMENT INDICATORTRUCK MOUNTED CRANE LOAD MOMENT INDICATORTRUCK MOUNTED CRANE LOAD MOMENT INDICATORTRUCK MOUNTED CRANE LOAD MOMENT INDICATOR

TRUCK MOUNTED CRANE LOAD MOMENT INDICATOR

  • Category: Load Moment Indicator
  • Application Areas: Rough terrain crane
  • Model:TLX68A
  • Shelf time:2013-12-20 13:09:30
  • Product description: Rough terrain crane Load Moment Indicator
  • INQUIRY

Technical Engineer(wechat)E-mail:sales@ycwpkj.com

MP:+8618972582893   Tel: +86-717-6746086   +86-717-6589876


ROUGH TERRAIN CRANE
LOAD MOMENT INDICATOR


█PRODUCT DESCRIPTION

The WANPU Load Moment Indicator consists of a central microprocessor unit,display, pressure transducers,length/angle sensor, and anti-two block switches.The fixed data regarding the crane, such as capacity charts, boom weights, centers of gravity and dimensions are stored in memory chips in the central processor unit. This data is the reference information used to calculate the operating conditions.  Boom length and boom angle are registered by the length/angle sensor, mounted inside the cable reel which is mounted on the boom.

The boom length is measured by the cable reel cable which also serves as an electrical conductor for the anti two-block switches.The crane load is measured by pressure transducers attached to the piston and rod side of the hoist cylinders.The real value, resulting from the pressure measurement is compared with the reference data, stored in the central processor memory and evaluated in the microprocessor. When limits are reached, an overload warning signal is generated at the operator’s console.


█PRODUCT FEATURES

Load charts can be programmed into the display.

Use automatic compensation method for the force sensor.

The display has a built-in processor, reducing the number of components to be installed in the crane cab.
Can expand to the "black box" function, according to the users’ needs can   storage alarm record for a long time.
The main interface using graphic display, sound and light alarm, automatic control.
sensor for monitoring  radius.
Instantaneous , height, radius and angular value.
Instant load vs. limit load comparison.
Special calibration by means of load diagram.
Audible and visual warning.
Anti-2-Block warning on screen
Adopted 7-10 inches LCD display.


█COMPONENTS

COMPONENTS

COMPONENTS

QUANTITY

Display

1

Pressure transducers

2

Length/angle sensor

1

Anti two-block switch

2

Warning light

1

DISPLAY



TLX68A LOAD MOMENT INDICATOR

TLX68A LOAD MOMENT INDICATOR

PRESSURE TRANSDUCERS


LENGTH/ANGLE SENSOR


ANTI TWO-BLOCK SWITCH


WARNING LIGHT



ORDER PRODUCTS

You can contact us by email about your order details, or place order on line

E-mail: sales@ycwpkj.com


█INSTALLATION AND COMMISSIONING

English User Manual(include all the details of each item) will be offered for installation and trouble shooting. Also free Remote Instant Technical assistance would be offered by ourengineers. Or we can send our engineers to assist you locally


█PACKING AND SHIPPING

Wooden case or carton, shipping method as customer's request or our suggestion.


█QUALITY ASSURANCE

One year frees repair for quality-warranty.Ano-lifetime free online after service.






How to choose products

Load Moment Indicator – LMI

For hydraulic cranes, the LMI reads its load value using a pair of pressure transducers, which read the cylinder pressures of the lift cylinders

Rated Capacity Indicator – RCI

On a Rated Capacity Indicator, the load weight value is calculated by reading the strain on the wire rope. This is done by using a load pin in a sheave, a running line tensiometer (linerider) or a dead-end load cell installed at the becket end. A digital load chart is also available to show load capacity.

Load Indicator – LI

This is the simplest form of load monitoring. Here, a strain gauge device is used to read the wire rope tension producing a load value. The load sensing device can be installed in line to the crane rigging or can be placed under hook.

What is crane load?

Each crane has a load chart that, in short, specifies the crane’s capabilities — detailing its features and how its lift capacity varies when considering distance and angle. … Before a crane is rented, transported, employed or purchased, the crane chart must be consulted.

What is a load moment indicator?

Load Moment (or Rated Capacity) Indicator means a system which aids the equipment operator by sensing (directly or indirectly) the overturning moment on the equipment, i.e., load multiplied by radius.

How does a load moment indicator work?
Using different sensing devices, the Load Moment Indicator monitors various crane functions and provides the operator with a continuous reading of the crane’s capacity. The readings continuously change as the crane moves through the motions needed to make the lift.


Scan the qr codeClose
the qr code
主站蜘蛛池模板: 日韩精品无码专区| 国产欧美另类久久久精品图片| 韩国三级无码hd中文字幕| 亚洲 欧美 国产 图片| 8ⅹ8x擦拨擦拨成人免费视频| 国精产品推荐视频| 伊人色综合一区二区三区影院视频| 国产欠欠欠18一区二区| 麻豆人妻少妇精品无码专区| 亚洲精品一区久久久久久| 久久久精品波多野结衣av| 久久天天躁狠狠躁夜夜不卡| 中文字幕无码色综合网| 久久人妻少妇嫩草AV蜜桃漫画| 国产精品videossex久久发布| 国内精品久久久久久久999| 亚洲阿v天堂在线| 日本精品久久久久中文字幕| 内射巨臀欧美在线视频| 国语自产精品视频在 视频| 丰满少妇三级全黄| 国产做爰又粗又大又爽动漫| 午夜福利精品亚洲不卡| 性色香蕉av久久久天天网| 亚洲精品亚洲人成在线观看麻豆| 欧美亚洲国产第一精品久久| 亚洲最大国产成人综合网站| 成人免费一区二区三区视频软件 | 欧美激情一区二区三区成人| 国产午夜人做人免费视频中文 | 亚洲日本va一区二区sa| 国产美足白丝榨精在线观看sm| 亚洲成aⅴ人片久青草影院| 精品国产一区二区三区四区色 | 亚洲国产精品久久久久制服| 国产精品中文久久久久久久| 激情 自拍 另类 亚洲| 国产精品亚洲一区二区| 国产精品一国产精品一k频道| 欧美亚洲日本高清不卡| 18?????网站"91|